Liffey Valley

Commitment to Precision & Quality

Having been appointed by the Main Contractor Vision Contracting, we successfully co-ordinated with the design team on this complex project, MMOS Engineering and the Architect was Henry J Lyons. The project took approx six months to complete from initial project meetings to installation.

Project Size: 500 tonnes of Pre-Fabricated steel, intumescent painted to 60 min protection. 2500 mtrs of cold-rolled Purlins & Rails.

Features: The steel design is a column and beam structure designed to carry decking for pouring concrete slabs over 3 levels. The co-ordination of the steel phasing with the difficulty of limited space required ODS Engineering to think very carefully about how the steel would be installed with out blocking ourselves out of certain areas.

Shap
Shap
Shap
Shap
Shap
Shap
Shap

Have a Project Planned?

Enquire now
We would love to hear from you

When you need a project partner with unmatched expertise and cutting-edge design and production capabilities, ODS is ready to transform your vision into reality.